Line 11 (Guangzhou Metro)
metro line of Guangzhou Metro

Line 11 of the Guangzhou Metro (Chinese: 广州地铁11号线; pinyin: Guǎngzhōu Dìtiě Shíyīhàoxiàn) is a fully automated rapid transit line in Guangzhou. It is a loop line around the city center, connecting Guangzhou railway station, Guangzhou East railway station, Pazhou, and Fangcun. It opened on 28 December 2024, minus Guangzhou Railway Station due to national rail station renovation requirements from China Railways.
Route
The line forms a 44.2-kilometre (27.5 mi) ring around the edge of the dense central areas of Guangzhou, allowing circumferential and tangential traffic to avoid transferring at the congested city center stations. As such, 19 of the line's 31 stations plan to have transfers with other lines. In addition, the line will act as a distributor for the numerous Pearl River Delta Metropolitan Region intercity railways, and the suburban radial subway lines (Guangzhou Metro Line 14, Line 21, Line 22 and Foshan Metro Line 11) that are expected to terminate at stations on Line 11.
History
Planning
In 1997 the "Guangzhou City Rapid Rail Transit Network Planning Study (Final Report)" proposed ring line 5 as an alternative to the B program. It followed a closed loop roughly along Newport Road, Changgang Road, Fangcun Avenue, Huangsha Avenue, Huanshi Road and the current Guangzhou New Central Axis. However, the final recommendation was for the A-ring program, so it was not adopted.
In 2008, a new round of rail transit network planning again proposed a loop line.
Begin with the source’s own compact description: “Line 11 (Guangzhou Metro)” is metro line of Guangzhou Metro. The dossier treats that line as a proposition to test through Line, Guangzhou and Metro, not as a finished interpretation.
Why this record matters
The phrase “metro line of Guangzhou Metro” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Aug 30, 2026. The linked authority identifier is Q6553058. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2024, 1997 and 2008.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Line 11 (Guangzhou Metro)”, its source revision and the description used here.
- Expand the search: follow Line 11 (Guangzhou Metro) primary sources, Line 11 (Guangzhou Metro) archive and Line research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Line 11 (Guangzhou Metro)”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Line 11 (Guangzhou Metro)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.