Baoji–Chengdu railway
railway line

The Baoji–Chengdu railway, Bao–Cheng railway or Bao–Cheng Line was formerly designed as a rail line that connects Tianshui and Chengdu called Tianshui–Chengdu railway (simplified Chinese: 天水—成都铁路; traditional Chinese: 天水—成都鐵路; pinyin: Tiānshuǐ Chéngdū Tiělù) or Tiancheng railway (simplified Chinese: 天成线; traditional Chinese: 天成線; pinyin: Tiān Chéng Xiàn). The line is a mixed single- and double-track, electrified, 676-kilometer railroad in China between Baoji in Shaanxi province and Chengdu in Sichuan province. It is one of main lines that connects southwestern with northwestern China and a part of the Lanzhou–Kunming Corridor of the Eight Verticals.
The line finished construction on 12 July 1956, after which it began operating on 1 January 1958. The rail line is also the first one in China to be electrified. The Baoji–Guangyuan section of the line is under the control of China Railway Xi'an Group, while the rest is in charge of China Railway Chengdu Group. The railway was added to the List of China's Industrial Heritages for Conservation in January 2018.
Line description
The Bao–Cheng Line runs southwards from Guanzhong Plain to Sichuan Basin and traverses the Qinling, Daba Mountains, and Jianmen after leaving Baoji. The rail line goes through 5 different zones of geological structures (including granite, quartzite, greenschist, conglomerate and slate); around 80% are in the mountainous area. The line stretches along the ancient roads and Qingjiang River after entering the Qin Mountains, as the track elevates with a slope of 30‰ in the Renjiawan–Yangjiawan section; the steepest section can reach 33‰.
“Baoji–Chengdu railway” enters the record as railway line. Crown Archives preserves that source wording while asking what Baoji, Chengdu and railway can confirm, complicate or overturn.
Why this record matters
“Baoji–Chengdu railway” is worth following because a concise public description often conceals a longer documentary argument. Here, Baoji, Chengdu and railway provides the most credible route into that argument.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Aug 1, 2026. The linked authority identifier is Q801901. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1956, 1958 and 2018.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Baoji–Chengdu railway”, its source revision and the description used here.
- Expand the search: follow Baoji–Chengdu railway primary sources, Baoji–Chengdu railway archive and Baoji research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Baoji–Chengdu railway”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Baoji–Chengdu railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.