Dongbanan station
Beijing Subway station in Chaoyang, Beijing

Dongbanan station (simplified Chinese: 东坝南站; traditional Chinese: 東壩南站; pinyin: Dōngbà Nán zhàn; lit. 'Dongba South') is a subway station on Line 3 of the Beijing Subway. It opened on December 15, 2024.
Station features
The station has an underground island platform.
Exits
There are 6 exits, lettered A, B, C1, C2, C3 and D. Exits B, C3 and D have accessible elevators.
History
The station was previously named as Pingfangcun (Chinese: 平房村; pinyin: Píngfángcūn). On January 18, 2024, it was officially renamed to Dongbanan.
Incident
On the evening of August 5, 2024, a construction worker (the person in charge of the project site of the professional subcontracting unit of the upper steel structure, the main body and the attached public area decoration, the ground shaft decoration and the square in front of the station) illegally crossed the fertilizer groove between the elevator shaft platform and the foundation pit retaining wall during the steel structure hoisting and welding operation at Exit B. Due to the lack of on-site edge protection facilities, the worker fell to the bottom of the foundation pit and died after being rescued.
The public source identifies “Dongbanan station” as beijing Subway station in Chaoyang, Beijing. This brief keeps that definition visible, then builds a research path around Dongbanan, station and Beijing.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Dongbanan station”, the useful work is to connect “beijing Subway station in Chaoyang, Beijing” to the records capable of establishing context and consequence.
Maps, plans, fabric surveys and administrative records can establish how the site’s name, extent and function changed over time. The source revision retrieved here is dated Aug 23, 2026. The linked authority identifier is Q103819135. Authority coordinates are 39.951, 116.541. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2024.
Architectural summaries often privilege surviving fabric and can understate demolished phases, contested use or displaced communities. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.
- Historic place names
- Jurisdictional context
- Routes into maps and plans
Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.
Three-step research path
- Establish the record: confirm the title “Dongbanan station”, its source revision and the description used here.
- Expand the search: follow Dongbanan station primary sources, Dongbanan station archive and Dongbanan research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Dongbanan station”?
- What physical evidence or contemporary plan supports the description?
- Which earlier names or jurisdictions may reveal additional records?
Search terms from this dossier
This entry incorporates text from “Dongbanan station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.