Železnici na Republika Severna Makedonija
railway operation company in North Macedonia

Železnici na Republika Severna Makedonija (ŽRSM; Macedonian: Железници на Република Северна Македонија (ЖРСМ), "Railways of the Republic of North Macedonia") was the public enterprise for railways in North Macedonia. In 2007 it was split into railway operation company ŽRSM Transport and the infrastructure company ŽRSM Infrastruktura.
North Macedonia is a member of the International Union of Railways (UIC). The UIC Country Code for North Macedonia is 65.
ŽRSM operates 1,435 mm (4 ft 8+1⁄2 in) standard gauge rail tracks in North Macedonia and maintains 925 km (575 mi) of lines, 315 km (196 mi) of which are electrified with the 25 kV 50 Hz AC system.
Trains
ŽRSM Transport operates a large number of train sets, which consist of passenger trains (diesel and electric trains) and freight trains.
A contract for the purchase of 6 new passenger train sets, manufactured by China's CRRC Corporation at the Zhuzhou Electric Locomotive Works, was signed in 2014. The first train-set arrived in August 2015. Each train consists of 3 rail cars, and is designed to carry 200 passengers. They will be used on routes from Skopje to Bitola, Gevgelija, Kičevo, Kumanovo, and Veles.
The public source identifies “Železnici na Republika Severna Makedonija” as railway operation company in North Macedonia. This brief keeps that definition visible, then builds a research path around Železnici, Republika and Severna.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Železnici na Republika Severna Makedonija”, the useful work is to connect “railway operation company in North Macedonia” to the records capable of establishing context and consequence.
Contemporary correspondence, administrative files and participant testimony can test how later narratives organized the event or institution. The source revision retrieved here is dated May 19, 2026. The linked authority identifier is Q921442. Authority coordinates are 41.979, 21.452. 3 of 3 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 2007, 2014 and 2015.
Later summaries often reconcile disputed chronology or motive more neatly than the contemporary record permits. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Compare institutional narratives with records created by participants and affected communities. Dates and formal titles are useful anchors, but not substitutes for context.
- Event chronology
- Institutional context
- Locating named record creators
Contemporary correspondence, government or organizational records, oral histories and cited historical scholarship.
Three-step research path
- Establish the record: confirm the title “Železnici na Republika Severna Makedonija”, its source revision and the description used here.
- Expand the search: follow Železnici na Republika Severna Makedonija primary sources, Železnici na Republika Severna Makedonija archive and Železnici research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Železnici na Republika Severna Makedonija”?
- Which voices are present, absent or mediated by the institution?
- What chronology connects this entry to wider political or social change?
Search terms from this dossier
This entry incorporates text from “Železnici na Republika Severna Makedonija” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.