Yunnan–Guangdong HVDC
HVDC overhead power line in China

The Yunnan–Guangdong HVDC is a high-voltage direct current transmission system connecting Chuxiong in the Yunnan to Suidong, Zengcheng in Guangdong, China. It is the first HVDC link in the world operating at a transmission voltage of 800 kV. The transmission line is operated by China Southern Power Grid. In 2007, the order to supply the system was awarded to Siemens Energy. The first pole was put into operation in December 2009 with the second pole to follow in June 2010.
The transmission system has a transmission capacity of 5,000 MW and a rated DC current of 3,125 A. It has a total length of 1,418 kilometres (881 mi). It transmits electricity from the hydropower plants in the Yunnan to the Guangdong, including cities of Guangzhou and Shenzhen.
Yunnan–Guangdong HVDC shares the grounding electrode together with HVDC Guizhou-Guangdong II at Linwu (coordinates:
23°44′48″ N 113°17′09″E).
This brief starts where responsible research should: with the source description of “Yunnan–Guangdong HVDC” as hVDC overhead power line in China. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as hVDC overhead power line in China. Its deeper value depends on whether names, dates, institutions and citations support that framing.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q1563640. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2007, 2009 and 2010.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Yunnan–Guangdong HVDC”, its source revision and the description used here.
- Expand the search: follow Yunnan–Guangdong HVDC primary sources, Yunnan–Guangdong HVDC archive and Yunnan research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Yunnan–Guangdong HVDC”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Yunnan–Guangdong HVDC” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.