CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Yantan Ship Lift

Open-knowledge reference entry

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJan 23, 2021
Entity authorityQ8048974 ↗
Source-derived summary

The Yantan Ship Lift is a large ship lift located on the Hongshui River, a tributary of the Pearl River in China.

The ship lift's basin can carry vessels of up to 250 tons.

The ship lift's basin is 40 metres (130 ft) × 10.8 metres (35 ft) × 1.8 metres (5.9 ft).

It lifts vessels 68.5 metres (225 ft).

It is an example of a Vertical Hoist Shiplift.

The ship lift is part of the Yantan Hydroelectric Project, and was completed in 1986.

The dam was built with the assistance of the World Bank.

Editorial summary

The public source identifies “Yantan Ship Lift” as open-knowledge reference entry. This brief keeps that definition visible, then builds a research path around Yantan, Ship and Lift.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—1986—that can be checked directly. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with Yantan, Ship and Lift providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Yantan Ship Lift”, the useful work is to connect “open-knowledge reference entry” to the records capable of establishing context and consequence.

Evidence profile

The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jan 23, 2021. The linked authority identifier is Q8048974. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1986.

Critical limits

A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Yantan Ship Lift”, its source revision and the description used here.
  2. Expand the search: follow Yantan Ship Lift primary sources, Yantan Ship Lift archive and Yantan research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Yantan Ship Lift”?
  2. Which cited source is closest to the event, object or claim?
  3. Which institution is responsible for the underlying evidence?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Yantan Ship Lift” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.