Yamal–Europe pipeline
natural gas pipeline from Russia to Germany

The Yamal–Europe natural gas pipeline is a 4,107-kilometre-long (2,552 mi) pipeline connecting Russian natural gas fields in the Yamal Peninsula and Western Siberia with Poland and Germany, through Belarus. The Poland portion ceased operating in 2022.
In Gazprom's development project nomenclature the pipeline consists of four sections,
Bovanenkovo–Ukhta (1,200 km or 750 mi),
Ukhta–Torzhok (970 km or 600 mi),
the western section from Torzhok also confusingly named Yamal–Europe (1,660 km or 1,030 mi), and the partly parallel SRTO–Torzhok branch section (2,200 km or 1,400 mi).
History
Planning for the Yamal–Europe pipeline started in 1992. Intergovernmental treaties between Russia, Belarus and Poland were signed in 1993. In 1994, Wingas started building the Poland section of the pipeline. The first gas was delivered to Germany through the Belarus-Polish corridor in 1997. The Belarus and Polish sections were completed in September 1999.
Construction of the Bovanenkovo–Ukhta section started in December 2008, at about the same time drilling of the first production well in the Bovanenkovo gas field started. The pipeline reached its rated capacity of about 33 billion cubic metres per annum (1.2 trillion cubic feet per annum) of natural gas in 2006, after completion of all compressor stations.
The public source identifies “Yamal–Europe pipeline” as natural gas pipeline from Russia to Germany. This brief keeps that definition visible, then builds a research path around Yamal, Europe and pipeline.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Yamal–Europe pipeline”, the useful work is to connect “natural gas pipeline from Russia to Germany” to the records capable of establishing context and consequence.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q612962. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2022, 1992, 1993 and 1994.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Yamal–Europe pipeline”, its source revision and the description used here.
- Expand the search: follow Yamal–Europe pipeline primary sources, Yamal–Europe pipeline archive and Yamal research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Yamal–Europe pipeline”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Yamal–Europe pipeline” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.