Yemen LNG
project in Yemen

Yemen LNG (also called YLNG) is the first natural gas liquefaction (LNG) project in Yemen. The LNG plant is located in Balhaf.
History
Yemen LNG Company was incorporated in 1995 to develop the LNG plant. In 1997, the development was halted because of the Asian economic crisis. The project was launched only in August 2005 after signing three LNG supply contracts. On 29 October 2007, Yemen LNG and Yemen state-owned oil and gas company Safer Exploration and Production agreed a 20-year contract, according to which Safer grants the LNG plant with supply up to 12.5 billion cubic meter (bcm) of gas per year from the Block 18 of the Marib-Jawf field. The production started on 15 October 2009.
Technical description
The project comprises upstream gas processing facilities including a transfer line linking processing units, a spur-line for transporting gas to the Ma'bar area and a 320 kilometres (200 mi), 38 inches (970 mm) pipeline connecting the gas processing facilities to the LNG plant. The plant consists of two LNG trains with the total capacity of 6.7 million tonnes per year. The contractors for the construction of LNG trains were Technip, JGC, and Kellogg Brown & Root.
This brief starts where responsible research should: with the source description of “Yemen LNG” as project in Yemen. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as project in Yemen. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Apr 6, 2026. The linked authority identifier is Q8052084. Authority coordinates are 13.985, 48.180. 1 of 2 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 1995, 1997, 2005 and 2007.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Yemen LNG”, its source revision and the description used here.
- Expand the search: follow Yemen LNG primary sources, Yemen LNG archive and Yemen research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Yemen LNG”?
- What terminology or title could unlock a more precise catalogue search?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Yemen LNG” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.