CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Wild River Dam

dam in Australia

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJul 1, 2026
Entity authorityQ7350034
Source-derived summary

The Wild River Dam, also known as the Herberton Dam, is an earth-filled embankment dam across the Wild River, located approximately 5 kilometres (3 mi) northeast of Herberton, in Far North Queensland, Australia.

Overview

Situated on Moomin Road and completed in 1994, the dam is 16 metres (52 ft) high and 230 metres (750 ft) long. The resultant 280-megalitre (230 acre⋅ft) reservoir draws from a relatively small catchment area of 8 square kilometres (3.1 sq mi).

Editorial summary

This brief starts where responsible research should: with the source description of “Wild River Dam” as dam in Australia. Everything that follows is an evidence route, not borrowed authority.

Editorial reviewA concise reference frame for defining the subject, testing terminology and identifying the institution closest to the evidence. The current lead gives the account dated anchors—1994—that can be checked directly. The selected authority fields contribute no independent date. The account is most persuasive where Wild, River and Australia can be independently traced.
Editorial analysis

Why this record matters

The subject matters to the general reference register because the source frames it as dam in Australia. Its deeper value depends on whether names, dates, institutions and citations support that framing.

Evidence profile

The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jul 1, 2026. The linked authority identifier is Q7350034. Authority coordinates are -17.366, 145.432. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1994.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Wild River Dam”, its source revision and the description used here.
  2. Expand the search: follow Wild River Dam primary sources, Wild River Dam archive and Wild research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Wild River Dam”?
  2. Which institution is responsible for the underlying evidence?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Wild River Dam” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.