CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Whitney Hill Wind Farm

wind farm in Illinois, United States

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionMay 22, 2026
Entity authorityQ115801387 ↗
Source-derived summary

The Whitney Hill Wind Farm is a 24-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The project was developed by Enel Green Power.

Detail

The Whitney Hill complex's 24 wind turbines were completed in December 2019. The project was designed to generate a maximum of 65.3 megawatts of electricity. The Whitney Hill complex utilizes leasehold rights to 5,000 acres of land.

Editorial summary

The public source identifies “Whitney Hill Wind Farm” as wind farm in Illinois, United States. This brief keeps that definition visible, then builds a research path around Whitney, Hill and Wind.

Editorial reviewA practical starting point whose main value is the path it opens into stronger specialist and primary sources. The current lead gives the account dated anchors—2019—that can be checked directly. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with Whitney, Hill and Wind providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Whitney Hill Wind Farm”, the useful work is to connect “wind farm in Illinois, United States” to the records capable of establishing context and consequence.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated May 22, 2026. The linked authority identifier is Q115801387. Authority coordinates are 39.957, -89.311. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2019.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Whitney Hill Wind Farm”, its source revision and the description used here.
  2. Expand the search: follow Whitney Hill Wind Farm primary sources, Whitney Hill Wind Farm archive and Whitney research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Whitney Hill Wind Farm”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which institution is responsible for the underlying evidence?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Whitney Hill Wind Farm” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.