CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Wheeling Tunnel

tunnel in West Virginia

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionAug 6, 2026
Entity authorityQ7992318
Source-derived summary

The Wheeling Tunnel is a set of twin tunnels named for and located in Wheeling, West Virginia. The tunnels are 0.27 miles (430 m) long each, cutting through Wheeling Hill, and each carries two lanes of Interstate 70 and U.S. Route 250. The tunnels originally took three years to construct, costing $6.9 million. Reconstruction of the tunnel, originally planned to take a total of 6 months, took over three years to complete between 2007 and 2010, at a cost of $13.7 million.

Overview

The Wheeling Tunnel sits between exits 1A and 1B on Interstate 70 and U.S. Route 250, which run concurrent through the city of Wheeling. The tunnel cuts through Wheeling Hill, and has two travel lanes in each tube. Due to the closeness of exit 1A to the western end of the tunnels, the tunnels' right lanes function as acceleration and deceleration lanes. Through traffic is restricted to the left lane in each tunnel and lane changes are prohibited.

A series of accidents involving semi-trailer trucks prompted local political candidates to push for trucks to be banned from the tunnel, diverting them to the nearby I-470.

Construction

The twin tunnels, which cost $6.9 million (equivalent to $73 million in 2025) to construct, are lined with a total of 13,000 square feet (1,200 m2) of industrial tile.

Editorial summary

The public source identifies “Wheeling Tunnel” as tunnel in West Virginia. This brief keeps that definition visible, then builds a research path around Wheeling, Tunnel and tunnel.

Editorial reviewA practical starting point whose main value is the path it opens into stronger specialist and primary sources. The current lead gives the account dated anchors—2007, 2010, 2025—that can be checked directly. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with Wheeling, Tunnel and tunnel providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Wheeling Tunnel”, the useful work is to connect “tunnel in West Virginia” to the records capable of establishing context and consequence.

Evidence profile

Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 6, 2026. The linked authority identifier is Q7992318. Authority coordinates are 40.073, -80.720. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2007, 2010 and 2025.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Wheeling Tunnel”, its source revision and the description used here.
  2. Expand the search: follow Wheeling Tunnel primary sources, Wheeling Tunnel archive and Wheeling research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Wheeling Tunnel”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which institution is responsible for the underlying evidence?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Wheeling Tunnel” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.