USS Peoria (PF-67)
1943 Tacoma-class frigate

USS Peoria (PF-67), a Tacoma-class frigate, was the third ship of the United States Navy to be named after Peoria, Illinois.
Construction
Peoria was constructed by the Leathem D. Smith Shipbuilding Company, and was completed in Sturgeon Bay, Wisconsin on 25 May 1943. Launched on 2 October 1943 and sponsored by Agnes Reynolds, she was commissioned on 2 January 1945 at Houston, Texas, under the command of Commander George R. Leslie, USCG.
Service history
Peoria's shakedown voyage (or sea trial) commenced on 12 January 1945, bound for the North Atlantic Ocean around Bermuda, and returned successfully to Norfolk, Virginia.
Peoria's first mission, begun on 4 March, was to sail with a convoy for the British Crown colony of Gibraltar. Peoria then continued on to Mers El Kébir, Algeria, concluding her journey on 19 March. She joined a returning convoy from Oran on 27 March, assigned with escorting it to the United States. Peoria then spent a brief amount of time at New York City, until she was called out for use in anti-submarine training at Casco Bay, Maine. On 7 May, she departed Casco Bay bound for New London, Connecticut. Peoria arrived at New London in time for VE day, as World War II concluded. Peoria spent two weeks training submarine crews at New London.
Begin with the source’s own compact description: “USS Peoria (PF-67)” is 1943 Tacoma-class frigate. The dossier treats that line as a proposition to test through Peoria, PF-67 and Tacoma-class, not as a finished interpretation.
Why this record matters
The phrase “1943 Tacoma-class frigate” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Feb 11, 2026. The linked authority identifier is Q7872798. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1943 and 1945.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “USS Peoria (PF-67)”, its source revision and the description used here.
- Expand the search: follow USS Peoria (PF-67) primary sources, USS Peoria (PF-67) archive and Peoria research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “USS Peoria (PF-67)”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “USS Peoria (PF-67)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.