USNS Marine Phoenix
ship built in 1945

USS Marine Phoenix (T-AP-195) was a Marine Adder-class transport that saw service with the US Navy for the task of transporting troops to and from combat areas. She was of the C4-S-A3 design type.
Construction
Marine Phoenix, approved 18 April 1944, was laid down by Kaiser Shipbuilding Co., Vancouver, Washington, 16 December 1944, as MC Hull no. 2365; launched 9 August 1945; sponsored by Mrs. Thomas M. Robins; and delivered to her operator, Moore-McCormack Lines, 9 November 1945.
Service history
The ship operated as a War Shipping Administration (WSA) troop transport from 27 October 1945 delivery until 1946. On 12 December 1945 Marine Phoenix departed Seattle, Washington with occupation troops for Nagoya Japan. There she embarked homeward‑bound veterans of the Pacific campaigns and departed for Seattle 4 January arriving 16 January 1946. After voyage repairs During the next five months she continued trooplift runs out of Seattle, to Japan, Korea, China, the Marianas, and the Hawaiian Islands. In 1947, she entered the Maritime Commission Reserve Fleet at Suisun Bay, California, where she remained for 3 years.
The public source identifies “USNS Marine Phoenix” as ship built in 1945. This brief keeps that definition visible, then builds a research path around USNS, Marine and Phoenix.
Why this record matters
A short description can identify a subject without explaining its stakes. For “USNS Marine Phoenix”, the useful work is to connect “ship built in 1945” to the records capable of establishing context and consequence.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Dec 15, 2025. The linked authority identifier is Q60744596. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1944, 1945, 1946 and 1947.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “USNS Marine Phoenix”, its source revision and the description used here.
- Expand the search: follow USNS Marine Phoenix primary sources, USNS Marine Phoenix archive and USNS research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “USNS Marine Phoenix”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “USNS Marine Phoenix” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.