CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Trent Wind Farm

Open-knowledge reference entry

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJul 6, 2025
Entity authorityQ7838479
Source-derived summary

The Trent Wind Farm, also known as the Trent Mesa Wind Project, is a 150 megawatt wind power station located between Abilene and Sweetwater in West Texas. The wind farm consists of 100 GE wind turbines each rated at 1.5 megawatts. American Electric Power owns the Trent Wind Farm and TXU Energy purchases the electricity produced under a long-term agreement.

The Trent Wind Farm began commercial operation in 2001, when it was the fourth largest wind farm operating in the United States.

Editorial summary

Begin with the source’s own compact description: “Trent Wind Farm” is open-knowledge reference entry. The dossier treats that line as a proposition to test through Trent, Wind and Farm, not as a finished interpretation.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—2001—that can be checked directly. The selected authority fields contribute no independent date. For this dossier, Trent, Wind and Farm is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “open-knowledge reference entry” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jul 6, 2025. The linked authority identifier is Q7838479. Authority coordinates are 32.422, -100.212. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2001.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Trent Wind Farm”, its source revision and the description used here.
  2. Expand the search: follow Trent Wind Farm primary sources, Trent Wind Farm archive and Trent research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Trent Wind Farm”?
  2. Which cited source is closest to the event, object or claim?
  3. What terminology or title could unlock a more precise catalogue search?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Trent Wind Farm” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.