CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Grenoble tramway

Tram system in Grenoble, France

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionAug 19, 2026
Entity authorityQ2036588 ↗
Source-derived summary

The Grenoble tramway (French: Tramway de Grenoble) is the tram system in the city of Grenoble in the Rhône-Alpes region of France. In 1987, Grenoble became the second French city to reintroduce trams, the first being the Nantes tramway. The current network is 35-kilometre (22 mi) long, and comprises five lines: lines A, B, C, D and E. Line A was opened in 1987, line B in 1990, line C on 20 May 2006, line D in October 2007 and line E on 28 June 2014.

The tramway is operated by the Société d'économie mixte des transports publics de l'agglomération grenobloise (SÉMITAG) on behalf of the Communauté d'agglomération Grenoble Alpes Métropole, the intercommunal structure linking the commune of Grenoble and its suburbs. SÉMITAG operates its services, which includes local bus services as well as the tramway, under the Tag brand.

History

The Historic Tramway of Grenoble was a 1,000 mm (3 ft 3+3⁄8 in) metre gauge urban and suburban electric tramway network from the Grenoble region of France. It was created in 1894 and operated by the société grenobloise de tramways électriques, which has today entirely disappeared. At this time of industrial and demographic growth, the old Hippomobile modes of transportation, fiacres and omnibuses, established since the end of the 18th century, were no longer sufficient to ensure smooth transport in cities. The urban and suburban lines developed continuously until the 1920s. At this point there were three main operators: the Société grenobloise de tramways électriques, which operated the urban lines; the Voies ferrées du Dauphiné, which served from Grenoble, the Left Bank of the Isère up to Froges as well as the valley of l'Oisans; and the tramway Grenoble - Chapareillan, which linked the center of Grenoble to Chapareillan and serves the whole Right Bank in the valley of Grésivaudan.

Editorial summary

The public source identifies “Grenoble tramway” as tram system in Grenoble, France. This brief keeps that definition visible, then builds a research path around Grenoble, tramway and Tram.

Editorial reviewA concise reference frame for defining the subject, testing terminology and identifying the institution closest to the evidence. The current lead gives the account dated anchors—1987, 1990, 2006, 2007—that can be checked directly. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with Grenoble, tramway and Tram providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Grenoble tramway”, the useful work is to connect “tram system in Grenoble, France” to the records capable of establishing context and consequence.

Evidence profile

The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Aug 19, 2026. The linked authority identifier is Q2036588. Authority coordinates are 45.187, 5.726. 1 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1987, 1990, 2006 and 2007.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Grenoble tramway”, its source revision and the description used here.
  2. Expand the search: follow Grenoble tramway primary sources, Grenoble tramway archive and Grenoble research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Grenoble tramway”?
  2. Which institution is responsible for the underlying evidence?
  3. What terminology or title could unlock a more precise catalogue search?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Grenoble tramway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.