project involving the construction of approximately 173 miles high-voltage transmission lines

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionSep 11, 2025
Entity authorityQ3407278
Source-derived summary

The Tehachapi Renewable Transmission Project is a project involving the construction of approximately 173 miles (278 km) of new and upgraded high-voltage transmission lines for transmission of electricity from wind farms and other generating units in southeastern Kern County, California to Los Angeles County and San Bernardino County.

The project, developed and operated by Southern California Edison, commenced construction on March 7, 2008 and was completed and placed in operation in December 2016. With a capacity of 4,500 megawatts, the transmission system can provide power for an estimated 3 million homes.

It passes through sections of the Tehachapi Mountains, Sierra Pelona Mountains, and Antelope Valley.

State laws requiring SCE to provide at least 33% of its power service from renewable sources by 2020 is driving the project. SCE had no interest in owning the land that the project is on, but needed to construct the transmission system nonetheless to meet the renewable source laws.

Editorial summary

This brief starts where responsible research should: with the source description of “Tehachapi Renewable Transmission Project” as project involving the construction of approximately 173 miles high-voltage transmission lines. Everything that follows is an evidence route, not borrowed authority.

Editorial reviewA concise reference frame for defining the subject, testing terminology and identifying the institution closest to the evidence. The current lead gives the account dated anchors—2008, 2016, 2020—that can be checked directly. The selected authority fields contribute no independent date. The account is most persuasive where Tehachapi, Renewable and Transmission can be independently traced.
Editorial analysis

Why this record matters

The subject matters to the general reference register because the source frames it as project involving the construction of approximately 173 miles high-voltage transmission lines. Its deeper value depends on whether names, dates, institutions and citations support that framing.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 11, 2025. The linked authority identifier is Q3407278. The first chronological checks are 2008, 2016 and 2020.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Tehachapi Renewable Transmission Project”, its source revision and the description used here.
  2. Expand the search: follow Tehachapi Renewable Transmission Project primary sources, Tehachapi Renewable Transmission Project archive and Tehachapi research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Tehachapi Renewable Transmission Project”?
  2. Which institution is responsible for the underlying evidence?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Tehachapi Renewable Transmission Project” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.