Taiyuan–Zhongwei–Yinchuan railway
railway line

The Taiyuan–Zhongwei–Yinchuan railway (Chinese: 太中银铁路) is a railway line in northern China, connecting Taiyuan, the capital of Shanxi Province, with Zhongwei and Yinchuan in Ningxia Hui Autonomous Region. It is a double-track electric railway, opened in 2011.
Routing
The main line of the railway runs in the general east-west direction from Taiyuan to Zhongwei via Lüliang and
Dingbian, serving a number of communities in western Shanxi, northern Shaanxi and Ningxia, many of which previously did not have rail service at all. The Dingbian-Yinchuan branch runs from Dingbian northwest, to Ningxia's capital city Yinchuan.
The railway also has a short dead-end branch from Lüliang to Lin County (Linxian) in the northwestern Shanxi.
In some areas (a section of the main line east of Dingbian, and the Dingbian-Yinchuan branch), the railway route roughly parallels the Great Wall of China.
Service
Together with the Shijiazhuang–Taiyuan high-speed railway, the Taiyuan–Zhongwei–Yinchuan railway provides a more direct route between Beijing and Ningxia than those that were available before. Together with the Zhongwei-Wuwei line in Ningxia and Gansu, it offers a shorter route between Beijing and Xinjiang than the more standard route via Zhengzhou and Lanzhou.
History
Construction started in May 2006. The railway was opened on January 11, 2011.
This brief starts where responsible research should: with the source description of “Taiyuan–Zhongwei–Yinchuan railway” as railway line. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as railway line. Its deeper value depends on whether names, dates, institutions and citations support that framing.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jun 26, 2023. The linked authority identifier is Q724579. The first chronological checks are 2011 and 2006.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Taiyuan–Zhongwei–Yinchuan railway”, its source revision and the description used here.
- Expand the search: follow Taiyuan–Zhongwei–Yinchuan railway primary sources, Taiyuan–Zhongwei–Yinchuan railway archive and Taiyuan research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Taiyuan–Zhongwei–Yinchuan railway”?
- What terminology or title could unlock a more precise catalogue search?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Taiyuan–Zhongwei–Yinchuan railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.