The Stillwater GeoSolar Hybrid Plant is a combined 61 MW solar energy and geothermal power plant in the U.S. state of Nevada. Located 12 miles (19 km) NE of Fallon, near Stillwater, the site includes a 26MW solar photovoltaic plant and a 2MW solar thermal plant that were added to a 33MW geothermal plant.

Overview

The project is a solar/geothermal plant and constructed by Enel Green Power. POWER Engineers Inc. provided detailed engineering services for the original binary geothermal plant as well as for the 2 MW Concentrating Solar Power (CSP) system. The total output of 15 GWh/month from the plant was sold to NV Energy. In summer, the PV plant produces more when the thermal plant is less efficient due to dry cooling in high temperatures.

Geothermal plant

The plant entered into operation in 2001, and revitalized in 2009.

Solar photovoltaic plant

Covering 240 acres (97 ha), the plant has 89,000 polycrystalline silicon solar panels and has a generation capacity of 26 MW. The photovoltaic generation was designed to make up for the reduction in output from the geothermal plant due to high ambient temperatures during summer midday hours.

Solar thermal plant

An additional 2 MWe (17 MWth) using concentrated solar power (CSP) in parabolic troughs began construction in 2014.

Editorial summary

Begin with the source’s own compact description: “Stillwater Triple Hybrid Power Plant” is open-knowledge reference entry. The dossier treats that line as a proposition to test through Stillwater, Triple and Hybrid, not as a finished interpretation.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—2001, 2009, 2014—that can be checked directly. The selected authority fields contribute no independent date. For this dossier, Stillwater, Triple and Hybrid is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “open-knowledge reference entry” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jul 31, 2026. The linked authority identifier is Q7617318. Authority coordinates are 39.544, -118.561. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2001, 2009 and 2014.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Stillwater Triple Hybrid Power Plant”, its source revision and the description used here.
  2. Expand the search: follow Stillwater Triple Hybrid Power Plant primary sources, Stillwater Triple Hybrid Power Plant archive and Stillwater research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Stillwater Triple Hybrid Power Plant”?
  2. Which institution is responsible for the underlying evidence?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Stillwater Triple Hybrid Power Plant” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.