Ohio State Route 700
highway in Ohio

State Route 700 (SR 700) is a 16.71-mile (26.89 km) long north–south state highway in the northeastern portion of the U.S. state of Ohio. The southern terminus of SR 700 is at SR 88 in Freedom Township, about 5 miles (8.0 km) south of Hiram. Its northern terminus is at a traffic circle where it meets SR 87 in Burton, a point that doubles as the northern terminus of SR 168.
Route description
Along its path, SR 700 passes through northern Portage County and southern Geauga County. No portion of this highway is included within the National Highway System (NHS). The NHS is a network of routes deemed to be most important for the economy, mobility and defense of the nation.
History
The route was originally part of the larger State Route 80, established in 1923. The original northern terminus for SR 80 was at US 422 in Welshfield before being extended north in 1939 to the current northern terminus of SR 700 at State Route 87 in Burton. The SR 700 designation was applied to the current route in 1942 after the section of SR 80 between State Route 88 in Freedom and State Route 14 in Edinburg was decommissioned in 1941 as part of the creation of the Ravenna Army Ammunition Plant. The portion from Edinburg south retained the SR 80 designation until 1962, when it was renumbered as State Route 183.
This brief starts where responsible research should: with the source description of “Ohio State Route 700” as highway in Ohio. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as highway in Ohio. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated May 8, 2025. The linked authority identifier is Q2492817. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1923, 1939, 1942 and 1941.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Ohio State Route 700”, its source revision and the description used here.
- Expand the search: follow Ohio State Route 700 primary sources, Ohio State Route 700 archive and Ohio research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Ohio State Route 700”?
- What terminology or title could unlock a more precise catalogue search?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Ohio State Route 700” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.