Sirinumu Dam
reservoir in Papua New Guinea

The Sirinumu Dam is an important piece of infrastructure within Papua New Guinea, providing both water and electricity to the electrical grid of the capital Port Moresby. The dam itself is located outside of Port Moresby, in Central Province. Its hydroelectric power generation produces most of the power for the city. At times when the dam has been shut down, either due to disputes with local landowners or due to low water levels, there have been water and electricity shortages in the city.
The dam was built by the Australian authorities, which governed the Territory of Papua and New Guinea at the time, from 1958 to 1963. It was built on what remains to this day the customary land of the Koiari people, following agreements made with the landowners. Since the 1970s, local landowners have claimed that the agreements have not been honoured by either the Australian government or later Papua New Guinean governments, and that they themselves lack consistent access to clean drinking water and electricity.
Location and design
The dam is located in Central Province, in a natural basin surrounded by mountains south of Sogeri. The dammed area receives inputs from the Laloki River and a number of its tributaries, which has become Lake Sirinumu. Some of the newly formed islands within the lake remain inhabited.
“Sirinumu Dam” enters the record as reservoir in Papua New Guinea. Crown Archives preserves that source wording while asking what Sirinumu, reservoir and Papua can confirm, complicate or overturn.
Why this record matters
“Sirinumu Dam” is worth following because a concise public description often conceals a longer documentary argument. Here, Sirinumu, reservoir and Papua provides the most credible route into that argument.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jul 1, 2026. The linked authority identifier is Q34924082. Authority coordinates are -9.503, 147.478. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1958 and 1963.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Sirinumu Dam”, its source revision and the description used here.
- Expand the search: follow Sirinumu Dam primary sources, Sirinumu Dam archive and Sirinumu research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Sirinumu Dam”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Sirinumu Dam” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.