Sawnee EMC
Georgia, US-based electrical cooperative

Sawnee EMC (SEMC; founded as Forsyth County EMC) is an electrical generation and transmission cooperative founded in July 1938 and based in Cumming, Georgia. As of 2022, Sawnee EMC is the third-largest electric co-op in Georgia and the eighth-largest in the United States; as of 2026 it operates 12,656 miles (20,368 km) of power lines in seven counties: Cherokee, Dawson, Forsyth, Fulton, Gwinnett, Hall, and Lumpkin. Sawnee is a member of the National Rural Electric Cooperative Association and Touchstone Energy.
As of 2026, Michael Goodroe is the president and CEO of Sawnee EMC.
History
After the Rural Electrification Administration was created in 1935, the Forsyth County Electric Membership Corporation was incorporated on July 16, 1938, and the co-op began providing electricity to about 750 homes via 163 miles (262 km) of power lines on June 22, 1939. Forsyth County EMC changed its name to Sawnee EMC in August 1950, taking its name from nearby Sawnee Mountain. In 1974, Sawnee EMC was one of the dozens of Georgia-based EMCs that founded Oglethorpe Power, and Sawnee was similarly a founding member of the renewables-focused Green Power EMC in 2001.
Domain name incident
In May 2024, Sawnee advised customers to switch from www.sawnee.com to www.sawnee.coop following a cyber security incident.
Board of directors
Sawnee EMC's board of directors as of 2026 is composed of nine elected members:
Foundation
Sawnee EMC operates the Sawnee Electric Membership Foundation, which donates to schools and charities in its service area. Since 2003, the foundation has given out $3.8 million.
This brief starts where responsible research should: with the source description of “Sawnee EMC” as georgia, US-based electrical cooperative. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as georgia, US-based electrical cooperative. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 11, 2026. The linked authority identifier is Q114115013. None of the 2 selected statements returned an explicit reference. The first chronological checks are 1938, 2022, 2026 and 1935.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Sawnee EMC”, its source revision and the description used here.
- Expand the search: follow Sawnee EMC primary sources, Sawnee EMC archive and Sawnee research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Sawnee EMC”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Sawnee EMC” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.