BAE Systems Tempest
proposed fighter aircraft concept by BAE Systems

The Tempest is a proposed sixth-generation fighter aircraft that is under development in the United Kingdom and Italy for the Royal Air Force (RAF) and the Aeronautica Militare (ITAF). The aircraft is intended to enter service from 2035, gradually replacing the Eurofighter Typhoon. It is being developed as part of the Future Combat Air System (FCAS) programme by a consortium known as Team Tempest, which includes the British Ministry of Defence, BAE Systems, Rolls-Royce, the UK subsidiary of Leonardo, and MBDA UK. £2 billion was set to be spent by the British government on the initial phase of the project up to 2025.
Both Italy and Sweden signed a Memorandum of Understanding in 2020 committing to explore collaboration on the FCAS programme. The UK, Italy and Japan announced they are working together on the joint development of engine and radar demonstrators. This was followed by an announcement in December 2022 of the Global Combat Air Programme (GCAP); a collaboration between Italy, Japan and the UK for a sixth-generation fighter aircraft. Italy has planned to spend €8.9 billion in the project up to 2035.
Programme history
Strategic concept development of Tempest began in 2015. Tempest is to replace the Eurofighter Typhoon in RAF service. The RAF's Second World War Hawker Tempest fighter also followed a Typhoon.
The public source identifies “BAE Systems Tempest” as proposed fighter aircraft concept by BAE Systems. This brief keeps that definition visible, then builds a research path around Systems, Tempest and proposed.
Why this record matters
A short description can identify a subject without explaining its stakes. For “BAE Systems Tempest”, the useful work is to connect “proposed fighter aircraft concept by BAE Systems” to the records capable of establishing context and consequence.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jul 26, 2026. The linked authority identifier is Q55593861. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2035, 2025, 2020 and 2022.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “BAE Systems Tempest”, its source revision and the description used here.
- Expand the search: follow BAE Systems Tempest primary sources, BAE Systems Tempest archive and Systems research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “BAE Systems Tempest”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “BAE Systems Tempest” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.