Grenoble–Montmélian railway
railway line in France

The railway from Grenoble to Montmélian is a 52 km (32 mi) long railway in southeastern France. It was built by the PLM and opened on 15 September 1864 (as a double track) to provide a link between Grenoble and Montmélian. In September 1991 it was electrified between Grenoble and Gières and electrification of the whole line was realised and in service by 15 December 2013.
History
In the past, the line took a route more north, closer to the centre of Grenoble. However, as part of the city's preparations for the 1968 Winter Olympics, the route was moved south, next to the Rocade Sud. A station was opened at Eybens and was used to serve the nearby Olympic Village. This deviation added about 3 km (1.9 mi) to the total length of the track. So as not to have the laborious task of changing all the milestones along the route, this new section was given distances as if it were part of the Ligne de Lyon - Grenoble, all the while staying part of this line. A part of the old line still exists at 45°10′46.10″N 5°43′12.16″E.
In an effort to make the line more profitable, the stations St Hélène du Lac, Le-Cheylas-la-Bussière, Tencin-Theys, Lancey and Domène were all closed to passenger traffic during the 1990s. Domène station stayed open in order to man the nearby factory slidings although trains do not stop.
Begin with the source’s own compact description: “Grenoble–Montmélian railway” is railway line in France. The dossier treats that line as a proposition to test through Grenoble, Montmélian and railway, not as a finished interpretation.
Why this record matters
The phrase “railway line in France” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Feb 8, 2025. The linked authority identifier is Q3239575. Authority coordinates are 45.179, 5.720. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1864, 1991, 2013 and 1968.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Grenoble–Montmélian railway”, its source revision and the description used here.
- Expand the search: follow Grenoble–Montmélian railway primary sources, Grenoble–Montmélian railway archive and Grenoble research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Grenoble–Montmélian railway”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Grenoble–Montmélian railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.