Rzeszów–Khmelnytskyi powerline
electrical power transmission line

The Rzeszów–Khmelnytskyi powerline is an electrical power transmission line between Ukraine and Poland. It is the only 750 kV-powerline in Poland, and one of a few in the European Union.
History
The decision to build this powerline was made in 1977 and it went in operation in 1985. The line went out of service after Poland joined the synchronous grid of Continental Europe (UCTE). However, there was a plan to re-activate this line after 2010 by constructing a back-to-back conversion station on the Polish end of the line, but this was not implemented.
In 2016 Energoatom announced it was considering disconnecting unit 2 of the Khmelnytskyi Nuclear Power Plant from the Ukrainian power grid and using the powerline to connect to the Burshtyn TES energy island which operates on the European power grid, to facilitate exports to Poland and Hungary. In 2019 the Ministry of Energy created a consortium, Ukraine Power Bridge Company Limited, to progress the project, but as of 2020 the project was not agreed. In 2022 Ukraine's grid had synchronised with the European grid and restoration work on the line began. As of 2023, it is operational at 400 kV.
Technical description
It has a length of 395 kilometres (245 mi), of which 281 km (175 mi) in Ukraine and 114 km (71 mi) in Poland. It runs from Widełka substation near Rzeszów in Poland to Khmelnytskyi Nuclear Power Plant in Ukraine.
Begin with the source’s own compact description: “Rzeszów–Khmelnytskyi powerline” is electrical power transmission line. The dossier treats that line as a proposition to test through Rzeszów, Khmelnytskyi and powerline, not as a finished interpretation.
Why this record matters
The phrase “electrical power transmission line” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q265944. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1977, 1985, 2010 and 2016.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Rzeszów–Khmelnytskyi powerline”, its source revision and the description used here.
- Expand the search: follow Rzeszów–Khmelnytskyi powerline primary sources, Rzeszów–Khmelnytskyi powerline archive and Rzeszów research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Rzeszów–Khmelnytskyi powerline”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Rzeszów–Khmelnytskyi powerline” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.