Royd Moor Wind Farm
located at Penistone, South Yorkshire, England

The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven, on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level.
These turbines were completed in 1993 and are 35 metres (115 ft) in height to the hub and have a rotor diameter of 37 metres (121 ft). The maximum output is 6 mW, equivalent to the annual energy required to power 3,300 homes.
The original planning application was for a 25-year operation but an extension until the end of 2027 was granted in 2021.
Begin with the source’s own compact description: “Royd Moor Wind Farm” is located at Penistone, South Yorkshire, England. The dossier treats that line as a proposition to test through Royd, Moor and Wind, not as a finished interpretation.
Why this record matters
The phrase “located at Penistone, South Yorkshire, England” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Apr 15, 2026. The linked authority identifier is Q7375199. Authority coordinates are 53.538, -1.688. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1993, 2027 and 2021.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Royd Moor Wind Farm”, its source revision and the description used here.
- Expand the search: follow Royd Moor Wind Farm primary sources, Royd Moor Wind Farm archive and Royd research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Royd Moor Wind Farm”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Royd Moor Wind Farm” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.