Bull Run Hydroelectric Project

dam project on the Bull Run River

Architectural plans, a scale model, maps and brass measuring instruments
Places and architectureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionAug 7, 2026
Entity authorityQ4996612
Source-derived summary

The Bull Run Hydroelectric Project was a Portland General Electric (PGE) development in the Sandy River basin in the U.S. state of Oregon. Originally built between 1908 and 1912 near the town of Bull Run, it supplied hydroelectric power for the Portland area for nearly a century, until it was removed in 2007 and 2008. The project used a system of canals, tunnels, wood box flumes and diversion dams to feed a remote storage reservoir and powerhouse. The entire project was removed because of rising environmental costs. Marmot Dam on the Sandy River was demolished in 2007, and the Little Sandy Dam on the Little Sandy River was taken down in 2008.

History and overview

The Mount Hood Railway and Power Company (MHR&P), also known as the Mount Hood Company, began the project in 1906, building the Little Sandy Dam to divert water through a wooden flume, about 3.2 miles (5.1 km) long, to Roslyn Lake. The dam reduced streamflows on the lower 1.7 miles (2.7 km) of the Little Sandy River and blocked all salmon and steelhead access to the upper 6.5 miles (10.5 km) of the river. Roslyn Lake was at 656 feet (200 m) above sea level, about 400 feet (120 m) higher than the mouth of the Bull Run River, at 242 feet (74 m). The 140-acre (57 ha) lake acted as a reservoir for the powerhouse, which was completed and put into operation in 1912, the same year that the MHR&P merged with Portland Railway, Light and Power Company (PRL&P), the predecessor of PGE.

In 1913 PRL&P built a dam on the Sandy River to supplement the Little Sandy Dam. The Marmot Dam, 45 feet (14 m) high, diverted water from the Sandy to the Little Sandy by canal and tunnel, the longest of which ran 4,690 feet (1,430 m) under the ridge between the two rivers.

Editorial summary

This brief starts where responsible research should: with the source description of “Bull Run Hydroelectric Project” as dam project on the Bull Run River. Everything that follows is an evidence route, not borrowed authority.

Editorial reviewMost useful as a place-based finding aid connecting the present description to earlier jurisdictions, maps and built evidence. The current lead gives the account dated anchors—1908, 1912, 2007, 2008—that can be checked directly. The selected authority fields contribute no independent date. The account is most persuasive where Bull, Hydroelectric and Project can be independently traced.
Editorial analysis

Why this record matters

The subject matters to the places & architecture register because the source frames it as dam project on the Bull Run River. Its deeper value depends on whether names, dates, institutions and citations support that framing.

Evidence profile

Maps, plans, fabric surveys and administrative records can establish how the site’s name, extent and function changed over time. The source revision retrieved here is dated Aug 7, 2026. The linked authority identifier is Q4996612. Authority coordinates are 45.429, -122.234. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1908, 1912, 2007 and 2008.

Critical limits

Architectural summaries often privilege surviving fabric and can understate demolished phases, contested use or displaced communities. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.

Best used for
  • Historic place names
  • Jurisdictional context
  • Routes into maps and plans
Verify next

Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.

Three-step research path

  1. Establish the record: confirm the title “Bull Run Hydroelectric Project”, its source revision and the description used here.
  2. Expand the search: follow Bull Run Hydroelectric Project primary sources, Bull Run Hydroelectric Project archive and Bull research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Bull Run Hydroelectric Project”?
  2. What physical evidence or contemporary plan supports the description?
  3. Which authority defined the place, boundary or structure at the relevant date?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Bull Run Hydroelectric Project” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.