CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Rapid Rail

public rail network

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJun 28, 2026
Entity authorityQ987598
Source-derived summary

Rapid Rail Sdn Bhd is the operator of the rapid transit (metro) system serving Kuala Lumpur and the Klang Valley area in Malaysia. A subsidiary of Prasarana Malaysia, it is the sole operator of six rapid transit lines which collectively form the Rapid KL rapid transit system. The system currently consists of four light rapid transit (LRT) lines, two mass rapid transit (MRT) lines and a monorail line, with another MRT currently under construction.

The LRT (narrow profile) and MRT (wide profile) lines operate on standard gauge (1,435 mm (4 ft 8+1⁄2 in)) rail, while the KL Monorail operates on an ALWEG straddle beam. Train services operate from 6:00 a.m. and typically end before midnight daily, with frequencies varying from approximately three minutes during peak hours to fourteen minutes during non-peak hours.

History

Malaysia's efforts to revolutionise commuting began in 1984 when the then Minister of Federal Territory Shahrir Abdul Samad released details of a light rapid transit (LRT) system implementation study for Kuala Lumpur. Many were skeptical over its implementation, especially when financing was a major question. The study, undertaken by a Belgian consortium in association with Spie Batignolles of France in cooperation with Master Carriage Malaysia Sdn Bhd, was for an urban or suburban LRT system - powered by overhead electric lines or catenaries. The system - covering 18 stations between Petaling Jaya and Sentul - was targeted for implementation in 1984 and completion in 1988.

Editorial summary

This brief starts where responsible research should: with the source description of “Rapid Rail” as public rail network. Everything that follows is an evidence route, not borrowed authority.

Editorial reviewA practical starting point whose main value is the path it opens into stronger specialist and primary sources. The current lead gives the account dated anchors—1984, 1988—that can be checked directly. The linked authority record independently contributes the date 1996-01-01. The account is most persuasive where Rapid, Rail and public can be independently traced.
Editorial analysis

Why this record matters

The subject matters to the general reference register because the source frames it as public rail network. Its deeper value depends on whether names, dates, institutions and citations support that framing.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jun 28, 2026. The linked authority identifier is Q987598. None of the 1 selected statements returned an explicit reference. The first chronological checks are 1984 and 1988.

Critical limits

A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Rapid Rail”, its source revision and the description used here.
  2. Expand the search: follow Rapid Rail primary sources, Rapid Rail archive and Rapid research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Rapid Rail”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Rapid Rail” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.