Rabat–Salé tramway
tram system in the Moroccan agglomeration of Rabat and Salé

The Rabat–Salé tramway (Arabic: طرامواي الرباط - سلا, lit. 'Ṭrāmwāy ar-Ribāt - Salā') is a tram system in the Moroccan agglomeration of Rabat and Salé cities which opened on 23 May 2011.
Network
The first tram network to exist in Rabat was inaugurated in 1917 and operated until 1930 when it was replaced by trolleybuses.
The modern system is 26 km (16.2 mi) long with 42 stops. It has two lines (1 and 2) with a combined section and frequency of 8 minutes in peak hours. It has a calculated ridership of 172,000 passengers per day. It is operated by Transdev with Alstom Citadis articulated modern trams consisting of two 5-piece sections. The lines use the special new Hassan II bridge over the Bou Regreg and pass near Rabat-Ville station and through the specially arranged aperture in the medieval city's wall. Expansion of existing lines and two more lines (3 and 4) were under construction, with opening scheduled for 2019 or 2020. The tramway is operated under contract by Transdev.
Lines
L1: exists and is under extension.
The public source identifies “Rabat–Salé tramway” as tram system in the Moroccan agglomeration of Rabat and Salé. This brief keeps that definition visible, then builds a research path around Rabat, Salé and tramway.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Rabat–Salé tramway”, the useful work is to connect “tram system in the Moroccan agglomeration of Rabat and Salé” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jul 23, 2026. The linked authority identifier is Q948685. 2 of 3 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 2011, 1917, 1930 and 2019.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Rabat–Salé tramway”, its source revision and the description used here.
- Expand the search: follow Rabat–Salé tramway primary sources, Rabat–Salé tramway archive and Rabat research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Rabat–Salé tramway”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Rabat–Salé tramway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.