Qinghua Donglu Xikou station
Beijing Subway station in Haidian, Beijing

Qinghua Donglu Xikou station (simplified Chinese: 清华东路西口站; traditional Chinese: 清華東路西口站; pinyin: Qīnghuá Dōnglù Xīkǒu zhàn) is a station on Line 15 of the Beijing Subway. It was opened on December 28, 2014, as a part of the stretch from Wangjingxi and serves as the western terminus of the line. The preceding station is Liudao Kou.
An infill station at this location on Line 13, between the existing Wudao Kou and Shangdi stations, is under construction. Construction of the Line 13 station started in May 2024. After the construction is completed, the station will be a transfer station on Line 13 and Line 15.
Station layout
Line 15
The station on Line 15 has two underground side platforms.
Line 13
The station on Line 13 will be an elevated station with two side platforms.
Exits
There are two exits in operation, lettered B and C. Exit C is accessible.
The public source identifies “Qinghua Donglu Xikou station” as beijing Subway station in Haidian, Beijing. This brief keeps that definition visible, then builds a research path around Qinghua, Donglu and Xikou.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Qinghua Donglu Xikou station”, the useful work is to connect “beijing Subway station in Haidian, Beijing” to the records capable of establishing context and consequence.
Place names and jurisdictional language are key evidence: both can reveal earlier catalogue descriptions and overlooked record series. The source revision retrieved here is dated Aug 24, 2026. The linked authority identifier is Q15919571. Authority coordinates are 39.999, 116.333. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2014 and 2024.
A single description cannot reconcile every naming convention, rebuilding phase or administrative transfer associated with a place. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.
- Historic place names
- Jurisdictional context
- Routes into maps and plans
Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.
Three-step research path
- Establish the record: confirm the title “Qinghua Donglu Xikou station”, its source revision and the description used here.
- Expand the search: follow Qinghua Donglu Xikou station primary sources, Qinghua Donglu Xikou station archive and Qinghua research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Qinghua Donglu Xikou station”?
- Which authority defined the place, boundary or structure at the relevant date?
- Which earlier names or jurisdictions may reveal additional records?
Search terms from this dossier
This entry incorporates text from “Qinghua Donglu Xikou station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.