Project Huriwaka
proposed wind farm in New Zealand

Project Huriwaka is a proposed wind farm located on the Hihitahi Plateau between Waiouru and Taihape, New Zealand. The project was originally developed and consented by Meridian Energy, but the consents were allowed to lapse. In May 2023 the rights to develop the project were acquired by Manawa Energy.
Consent process
Meridian Energy applied for resource consents for a 52 turbine farm generating 130 MW in 2008. The consent hearing was held in December and Horizons Regional Council granted the resource consents in February 2009. The decision was appealed to the Environment Court in September 2009 and in January 2010 the court ruled the wind farm project could proceed. The approved consent conditions limited the number of turbines to 52 and maximum blade height to 135 m. In May 2015 the resource consents were extend for five years, until 2020.
Consent for the wind farm lapsed in May and June 2020. In 2021 Meridian planned to apply for a new consent for the site.
Begin with the source’s own compact description: “Project Huriwaka” is proposed wind farm in New Zealand. The dossier treats that line as a proposition to test through Project, Huriwaka and proposed, not as a finished interpretation.
Why this record matters
The phrase “proposed wind farm in New Zealand” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 21, 2026. The linked authority identifier is Q7249025. Authority coordinates are -39.531, 175.807. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2023, 2008, 2009 and 2010.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Project Huriwaka”, its source revision and the description used here.
- Expand the search: follow Project Huriwaka primary sources, Project Huriwaka archive and Project research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Project Huriwaka”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Project Huriwaka” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.