Palézieux–Bulle–Montbovon railway line
Metric gauge railway in Switzerland

The Palézieux–Bulle–Montbovon railway line is a 1,000 mm (3 ft 3+3⁄8 in) metre gauge railway line in the canton of Fribourg, Switzerland. It runs 43.2 kilometres (26.8 mi) from Palézieux to Montbovon. The line is owned and operated by Transports publics Fribourgeois (TPF).
History
The first section between Palézieux and Châtel-St-Denis opened on 29 April 1901. It was built by the Chemin de fer Châtel-St-Denis–Palézieux (CP). The Chemins de fer électriques de la Gruyère (CEG) built another line east from Châtel-St-Denis to Vuadens, opening on 23 July 1903. At the same time, the CEG opened a line north from Montbovon to La Tour-de-Trême. The CEG closed the gap in 1904, completing sections between Vaudens and Bulle on 14 July and Bulle and La Tour-de-Trême on 21 September. The CEG acquired the CP on 20 December 1907.
In 1942, the CEG merged with two other companies to form the Chemins de fer fribourgeois Gruyère–Fribourg–Morat (GFM).
“Palézieux–Bulle–Montbovon railway line” enters the record as metric gauge railway in Switzerland. Crown Archives preserves that source wording while asking what Palézieux, Bulle and Montbovon can confirm, complicate or overturn.
Why this record matters
“Palézieux–Bulle–Montbovon railway line” is worth following because a concise public description often conceals a longer documentary argument. Here, Palézieux, Bulle and Montbovon provides the most credible route into that argument.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Aug 31, 2025. The linked authority identifier is Q2961513. Authority coordinates are 46.620, 7.026. None of the 1 selected statements returned an explicit reference. The first chronological checks are 1901, 1903, 1904 and 1907.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Palézieux–Bulle–Montbovon railway line”, its source revision and the description used here.
- Expand the search: follow Palézieux–Bulle–Montbovon railway line primary sources, Palézieux–Bulle–Montbovon railway line archive and Palézieux research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Palézieux–Bulle–Montbovon railway line”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Palézieux–Bulle–Montbovon railway line” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.