Dartmoor line
railway line in Devon, England

The Dartmoor line is a 15+1⁄2-mile (24.9 km) railway line in Devon, England. From Crediton, the line runs alongside the Tarka Line to the site of the former Coleford Junction where it diverges west to Okehampton. Previously a heritage line, it is owned by Network Rail.
The route was originally part of the London and South Western Railway's route from Exeter to Plymouth, which was opened between 1865 and 1879. In 1968, British Rail closed the line beyond Meldon (two miles (3.2 km) beyond Okehampton) as part of the Beeching cuts. The Exeter to Okehampton passenger service was withdrawn by British Rail in 1972. The line itself remained open for freight services from the railway ballast quarry at Meldon.
From 1997 to 2019, the line was operated as a heritage railway by the Dartmoor Railway community interest company. During this time, Great Western Railway ran a public service between Exeter and Okehampton on summer Sundays. Meldon quarry was mothballed in 2011, ceasing the use of the line for freight.
Begin with the source’s own compact description: “Dartmoor line” is railway line in Devon, England. The dossier treats that line as a proposition to test through Dartmoor, line and railway, not as a finished interpretation.
Why this record matters
The phrase “railway line in Devon, England” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 16, 2026. The linked authority identifier is Q5225649. Authority coordinates are 50.732, -3.996. 1 of 2 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 1865, 1879, 1968 and 1972.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Dartmoor line”, its source revision and the description used here.
- Expand the search: follow Dartmoor line primary sources, Dartmoor line archive and Dartmoor research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Dartmoor line”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Dartmoor line” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.