CACrown ArchivesThe cinema collection
Menu
Research dossier · Places & Architecture

Nysted Wind Farm

Danish offshore wind farm in the Baltic Sea

Architectural plans, a scale model, maps and brass measuring instruments
Places and architectureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionMay 5, 2024
Entity authorityQ934359 ↗
Source-derived summary

The Nysted Wind Farm (also known as Rødsand) is a Danish offshore wind farm close to the Rødsand sand bank near Lolland. Gravity base foundations are used rather than piles due to ice conditions.

Rødsand I

Rødsand I was built in 2003, with 72 turbines and a total capacity of 166 MW, and was the largest in the world until 2007. Annual production is some 570 GW·h, the equivalent to the electricity consumption of 140,000 Danish homes, which could save 500,000 tonnes of CO2 emissions. Turbines were installed by A2SEA. It receives 45 øre per kW·h for the first 42,000 full-load hours, which is about 11 years.

Rødsand I was out for 41⁄2 months in 2007 when the main transformer suffered a malfunction, causing a production loss of 23 million DKK per month.

In September 2010, DONG bought E.ON's 20% share and sold half of the entire project to pension fund PensionDanmark for 700 million kroner (€94 million / US$120 million) — almost half the DKK1,600 million cost. Stadtwerke Lübeck also owns a share.

As of 2013 it has an availability of 97 percent.

Rødsand II

In 2010, a 207 MW extension of the existing wind farm was installed by E.ON at a stated cost of EUR450m and a power purchase agreement at DKK 0.629 per kW·h (US$0.12/kW·h).

Editorial summary

The public source identifies “Nysted Wind Farm” as danish offshore wind farm in the Baltic Sea. This brief keeps that definition visible, then builds a research path around Nysted, Wind and Farm.

Editorial reviewA valuable geographic starting point for tracing changing names, boundaries, uses and administrative responsibility. The current lead gives the account dated anchors—2003, 2007, 2010, 2013—that can be checked directly. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with Nysted, Wind and Farm providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Nysted Wind Farm”, the useful work is to connect “danish offshore wind farm in the Baltic Sea” to the records capable of establishing context and consequence.

Evidence profile

The strongest evidence will usually combine a dated visual record with documents produced by the authority responsible for the place. The source revision retrieved here is dated May 5, 2024. The linked authority identifier is Q934359. Authority coordinates are 54.535, 11.667. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2003, 2007, 2010 and 2013.

Critical limits

A single description cannot reconcile every naming convention, rebuilding phase or administrative transfer associated with a place. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.

Best used for
  • Historic place names
  • Jurisdictional context
  • Routes into maps and plans
Verify next

Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.

Three-step research path

  1. Establish the record: confirm the title “Nysted Wind Farm”, its source revision and the description used here.
  2. Expand the search: follow Nysted Wind Farm primary sources, Nysted Wind Farm archive and Nysted research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Nysted Wind Farm”?
  2. Which authority defined the place, boundary or structure at the relevant date?
  3. Which earlier names or jurisdictions may reveal additional records?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Nysted Wind Farm” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.