Nuclear power in the Czech Republic
overview of nuclear power in the Czech Republic

The Czech Republic operates two nuclear power plants: Temelín and Dukovany. In 2019, the government set a goal to increase the share of nuclear electricity production from 30 % to 58 %. To this end, a new reactor is to be constructed at the Dukovany site, which will replace older units by 2035. New capacity is also proposed to be added at the Temelín site. In 2025, nuclear power produced approximately 42% of the country's electricity.
History
In 1955, with Soviet support, the Government committee for research and peaceful use of nuclear power and the Institute for Nuclear Physics were created. The first director of the Institute of Nuclear Physics was Professor Čestmír Šimáně, known as the founder of Czechoslovak nuclear research.
In August 1955, the first Faculty of Technical and Nuclear Physics was created under Charles University, in preparation for the upcoming construction of first nuclear power plants in Czechoslovakia. The faculty is now part of CTU.
In 1956 a decision was made to build the first nuclear power station in Czechoslovakia, in Jaslovské Bohunice, western Slovakia. The KS 150 or A1 reactor (120 MWe) was selected because of its ability to use unenriched uranium mined in Czechoslovakia.
“Nuclear power in the Czech Republic” enters the record as overview of nuclear power in the Czech Republic. Crown Archives preserves that source wording while asking what Nuclear, power and Czech can confirm, complicate or overturn.
Why this record matters
“Nuclear power in the Czech Republic” is worth following because a concise public description often conceals a longer documentary argument. Here, Nuclear, power and Czech provides the most credible route into that argument.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 28, 2026. The linked authority identifier is Q934554. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2019, 2035, 2025 and 1955.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Nuclear power in the Czech Republic”, its source revision and the description used here.
- Expand the search: follow Nuclear power in the Czech Republic primary sources, Nuclear power in the Czech Republic archive and Nuclear research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Nuclear power in the Czech Republic”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Nuclear power in the Czech Republic” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.