Nowergup railway depot
Transperth railway depot in Perth, Western Australia

Nowergup railway depot is a Transperth depot in the suburb of Nowergup, Western Australia. It is situated in the median of the Mitchell Freeway between the Lukin Drive and Hester Avenue interchanges.
History
Nowergup depot was built to service the Transperth B-series electric multiple units that were ordered to operate service on the Yanchep line (formerly known as the Joondalup line). It is owned by the Public Transport Authority and leased to EDi Rail / Alstom Transport as part of its contract to maintain the B-series trains.
The depot was completed on 17 May 2004 and officially opened on 13 June 2004 by Premier Geoff Gallop and Planning & Infrastructure Minister Alannah MacTiernan. It was built at the end of a single track extension of the Yanchep line (then called the Joondalup line) beyond its then terminus of Clarkson. The line was extended to Butler in 2014 with the track duplicated and was further extended to Yanchep in 2024.
The depot is currently the base for B-series and C-series electric multiple units that operate services on the Yanchep and Mandurah lines. It is capable of holding 47 of the 3-car trains.
The public source identifies “Nowergup railway depot” as transperth railway depot in Perth, Western Australia. This brief keeps that definition visible, then builds a research path around Nowergup, railway and depot.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Nowergup railway depot”, the useful work is to connect “transperth railway depot in Perth, Western Australia” to the records capable of establishing context and consequence.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Jul 26, 2026. The linked authority identifier is Q7066646. Authority coordinates are -31.659, 115.728. 2 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2004, 2014 and 2024.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Nowergup railway depot”, its source revision and the description used here.
- Expand the search: follow Nowergup railway depot primary sources, Nowergup railway depot archive and Nowergup research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Nowergup railway depot”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Nowergup railway depot” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.