New England road marking system
Regional Road Network

The New England road marking system was a regional system of marked numbered routes in the six-state region of New England in the United States. The routes were marked by a yellow rectangular sign with black numbers and border. Many signs were painted on telephone poles. The routes were approved by the highway departments of the six New England states in April 1922.
Prior to the New England road marking system, through routes were mainly marked with colored bands on telephone poles. These were assigned by direction (red for east–west, blue for north–south and yellow for intermediate or diagonal routes). The Massachusetts Highway Commission convinced the rest of southern New England and New York to use this system in 1915 (New Hampshire and Vermont already had their own schemes, and Maine also opted out), and it was the main system until 1922.
The New England road marking system, while limited to New England, was designed for expansion to the whole country. One- and two-digit numbers were assigned to major interstate routes, with three-digit routes for state routes (marked in a rectangle, with the state abbreviation below the number). In general, odd numbers ran east–west and even numbers ran north–south.
The public source identifies “New England road marking system” as regional Road Network. This brief keeps that definition visible, then builds a research path around England, road and marking.
Why this record matters
A short description can identify a subject without explaining its stakes. For “New England road marking system”, the useful work is to connect “regional Road Network” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jun 5, 2026. The linked authority identifier is Q824304. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1922 and 1915.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “New England road marking system”, its source revision and the description used here.
- Expand the search: follow New England road marking system primary sources, New England road marking system archive and England research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “New England road marking system”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “New England road marking system” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.