CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

New Beijing Poly Plaza

office/mixed in Beijing, China

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionMay 19, 2026
Entity authorityQ7005493 ↗
Source-derived summary

The New Beijing Poly Plaza is a building complex in Dongcheng, Beijing, China. Completed in 2007 for the China Poly Group Corporation, it houses the company headquarters, other office space, retail, restaurants, and the Poly Museum.

The New Beijing Poly Plaza sits northeast of the Forbidden City on the 2nd Ring Road, near the Beijing Subway entrance of Exit D of Dongsi Shitiao Station of Line 2.

Its large atrium looks out onto a major highway intersection and across the road to the earlier China Poly Headquarters.

Architecture

For their new headquarters, China Poly Group wanted a design that would reflect their multiple corporate interests in a unified structure.

The structure has three main components: an L-shaped office building, a 21-story high glass-enclosed atrium, and a hanging structure referred to as the 'lantern.'

The overall footprint on the 65,000-square-meter site is of a right triangle. Each leg of the L-shaped building measures 76.5 m long by 22.5 m wide. The hypotenuse of the triangle is formed by a glass cable-net wall faces northeast, and reduces the overall exterior surface area of the building, helping to moderate the interior climate. The south and west walls of the building deflect direct summer sun with a travertine fin-wall and brise soleil shades that don't obstruct views. The travertine façade is illuminated with fluorescent lights, emphasizing even at night the building's play of light and shadow.

Editorial summary

The public source identifies “New Beijing Poly Plaza” as office/mixed in Beijing, China. This brief keeps that definition visible, then builds a research path around Beijing, Poly and Plaza.

Editorial reviewA concise reference frame for defining the subject, testing terminology and identifying the institution closest to the evidence. The current lead gives the account dated anchors—2007—that can be checked directly. The linked authority record independently contributes the date 2007. Its value is orientation rather than verdict, with Beijing, Poly and Plaza providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “New Beijing Poly Plaza”, the useful work is to connect “office/mixed in Beijing, China” to the records capable of establishing context and consequence.

Evidence profile

The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated May 19, 2026. The linked authority identifier is Q7005493. Authority coordinates are 39.932, 116.426. 3 of 3 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2007.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “New Beijing Poly Plaza”, its source revision and the description used here.
  2. Expand the search: follow New Beijing Poly Plaza primary sources, New Beijing Poly Plaza archive and Beijing research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “New Beijing Poly Plaza”?
  2. Which cited source is closest to the event, object or claim?
  3. Which institution is responsible for the underlying evidence?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “New Beijing Poly Plaza” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.