MP/M
multi-user version of the CP/M operating system

MP/M (Multi-Programming Monitor Control Program) is a discontinued multi-user version of the CP/M operating system, created by Digital Research developer Tom Rolander in 1979. It allowed multiple users to connect to a single computer, each using a separate terminal.
MP/M was a fairly advanced operating system for its era, at least on microcomputers. It included a priority-scheduled multitasking kernel (before such a name was used, the kernel was referred to as the nucleus) with memory protection, concurrent input/output (XIOS) and support for spooling and queueing. It also allowed for each user to run multiple programs, and switch between them.
MP/M platforms
MP/M-80
The 8-bit system required a 8080 (or Z80) CPU and a minimum of 32 KB of RAM to run, but this left little memory for user applications. In order to support reasonable setups, MP/M allowed for memory to be switched in and out of the machine's "real memory" area. So for instance a program might be loaded into a "bank" of RAM that was not addressable by the CPU, and when it was time for the program to run that bank of RAM would be "switched" to appear in low memory (typically the lower 32 or 48 KB) and thus become visible to the OS. This technique, known as bank switching was subsequently added to the single user version of CP/M with version 3.0.
One of the primary uses of MP/M, perhaps to the surprise of DRI, was as a "power user" version of CP/M for a single user. The ability to run several programs at the same time and address large amounts of memory made the system worth the extra price.
This brief starts where responsible research should: with the source description of “MP/M” as multi-user version of the CP/M operating system. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as multi-user version of the CP/M operating system. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jul 17, 2026. The linked authority identifier is Q3317219. None of the 2 selected statements returned an explicit reference. The first chronological checks are 1979.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “MP/M”, its source revision and the description used here.
- Expand the search: follow MP/M primary sources, MP/M archive and multi-user research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “MP/M”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “MP/M” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.