Myanzi–Kassanda–Bukuya–Kiboga Road
road in Uganda

The Myanzi–Kassanda–Bukuya–Kiboga Road is a road in Uganda, connecting the towns of Myanzi, Kassanda and Bukuya in Mubende District, to Kiboga in Kiboga District.
Location
The road starts at Myanzi, on the Mityana–Mubende Road, about 16.5 kilometres (10 mi) west of Mityana. From there, it takes a northwesterly route to Kassanda, a distance of about 18 kilometres (11 mi). From Kassanda, the road turns northwards to Bukuya, a distance of about 15 kilometres (9 mi). From Bukuya, the road turns northwestwards and continues to Kiboga, a distance of approximately 32.5 kilometres (20 mi).
Overview
This road is an important transport corridor between Kiboga District and Mubende District. The road is prone to flooding, and when it does, it disrupts travel between the two districts and between those two and Mityana District.
Upgrading to bitumen
The gravel-surfaced road is under the purview of Uganda National Roads Authority. During his 2016 presidential electoral campaigns, President Yoweri Museveni made a pledge to upgrade this road to class II bitumen standard.
“Myanzi–Kassanda–Bukuya–Kiboga Road” enters the record as road in Uganda. Crown Archives preserves that source wording while asking what Myanzi, Kassanda and Bukuya can confirm, complicate or overturn.
Why this record matters
“Myanzi–Kassanda–Bukuya–Kiboga Road” is worth following because a concise public description often conceals a longer documentary argument. Here, Myanzi, Kassanda and Bukuya provides the most credible route into that argument.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jul 26, 2026. The linked authority identifier is Q25227130. Authority coordinates are 0.615, 31.836. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2016.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Myanzi–Kassanda–Bukuya–Kiboga Road”, its source revision and the description used here.
- Expand the search: follow Myanzi–Kassanda–Bukuya–Kiboga Road primary sources, Myanzi–Kassanda–Bukuya–Kiboga Road archive and Myanzi research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Myanzi–Kassanda–Bukuya–Kiboga Road”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Myanzi–Kassanda–Bukuya–Kiboga Road” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.