Mozambique–South Africa Oil Pipeline
Open-knowledge reference entry

The Mozambique–South Africa Oil Pipeline is a proposed multiproduct petrol and diesel fuel pipeline from Maputo to Gauteng, South Africa.
Route
The 500 kilometres (310 mi) long pipeline will run from an existing coastal fuel-storage facility at Matola harbour in Mozambique to Nelspruit, Mpumalanga in South Africa. From there the pipeline will then continue to Kendal in Mpumalanga, where it could join the current Transnet Pipelines petroleum pipeline network. The project also foresees potential transport to neighboring countries, such as Botswana.
Technical description
The initial capacity of the pipeline will be 6 million cubic meters of oil per year. It is possible that the maximum capacity would be higher because of the high demand. The project foresees the refurbishment and construction of tankage and improved loading capabilities in Matola, and new tankage in Nelspruit, Mpumalanga.
The technical design of the pipeline is led by VGI Consulting Engineers. The environmental impact assessment is coordinated by Nature & Business Alliance Africa. The pipeline is expected to cost US$620 million.
The public source identifies “Mozambique–South Africa Oil Pipeline” as open-knowledge reference entry. This brief keeps that definition visible, then builds a research path around Mozambique, South and Africa.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Mozambique–South Africa Oil Pipeline”, the useful work is to connect “open-knowledge reference entry” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q6927851. None of the 0 selected statements returned an explicit reference.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Mozambique–South Africa Oil Pipeline”, its source revision and the description used here.
- Expand the search: follow Mozambique–South Africa Oil Pipeline primary sources, Mozambique–South Africa Oil Pipeline archive and Mozambique research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Mozambique–South Africa Oil Pipeline”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Mozambique–South Africa Oil Pipeline” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.