Mirsk–Świeradów Nadleśnictwo railway
railway line

Mirsk–Świeradów Nadleśnictwo railway (before 1945 known as the Isergebirgsbahn or Izera Mountains Railway) was a single-track, non-electrified railway line with a length of 11.011 km, which connected Mirsk railway station with Świeradów Nadleśnictwo railway station. The line was located in the Lower Silesian Voivodeship, within the counties of Lwówek (Gmina Mirsk) and Lubań (town of Świeradów-Zdrój).
The construction of the line was initiated by private interests. The first work began in 1908, and regular operations on the Mirsk–Świeradów-Zdrój section started on 31 October 1909. The section to Świeradów Nadleśnictwo was opened for regular use on 10 June 1910. The newly built route was initially a narrow-gauge railway with a track gauge of 600 mm, which was later converted to standard gauge after a few years. After World War II, the line was taken over by Polish State Railways, and the first train ran on 18 December 1946 after the bridge over the Kwisa river was rebuilt. The section from Świeradów-Zdrój to Świeradów Nadleśnictwo was scheduled for closure on 15 December 1995. The last passenger train departed from Świeradów-Zdrój railway station on 11 February 1996, but freight traffic continued for another two years.
Between 2021 and 2023, the former Izera Mountains Railway, along with the section No.
“Mirsk–Świeradów Nadleśnictwo railway” enters the record as railway line. Crown Archives preserves that source wording while asking what Mirsk, Świeradów and Nadleśnictwo can confirm, complicate or overturn.
Why this record matters
“Mirsk–Świeradów Nadleśnictwo railway” is worth following because a concise public description often conceals a longer documentary argument. Here, Mirsk, Świeradów and Nadleśnictwo provides the most credible route into that argument.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Aug 7, 2026. The linked authority identifier is Q879645. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1945, 1908, 1909 and 1910.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Mirsk–Świeradów Nadleśnictwo railway”, its source revision and the description used here.
- Expand the search: follow Mirsk–Świeradów Nadleśnictwo railway primary sources, Mirsk–Świeradów Nadleśnictwo railway archive and Mirsk research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Mirsk–Świeradów Nadleśnictwo railway”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Mirsk–Świeradów Nadleśnictwo railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.