Mike Glover (engineer)
British engineer

Michael John Glover (born 1946) is a British Engineer and a director of Arup and technical director of 'Rail Link Engineering'.
Career
Mike Glover joined Arup as a graduate of the University of Surrey in 1969 and trained as a civil and structural engineer. He worked on Foster and Partners' Hong Kong & Shanghai Bank headquarters in Hong Kong, followed by the design and execution of projects in the oil and gas industry. He subsequently became Technical Director and Deputy Project Director for the £5.8bn high speed Channel Tunnel Rail Link (CTRL), a position he has held throughout its design, construction, commissioning and handover.
Awards
Glover was made a fellow of Arup in 2006, to "recognise the highest design and technical achievements of an Arup person".
Glover was awarded the 2007 Sir Frank Whittle Medal by the Royal Academy of Engineering, and the Gold Medal of the Institution of Structural Engineers in 2008 'for his outstanding contributions to the design and construction of major multi-disciplinary projects, including tall buildings, energy projects and large transportation and infrastructure projects around the world'.
In 2009 Glover was awarded an OBE in the New Year's honours list. This was for services to engineering.
This brief starts where responsible research should: with the source description of “Mike Glover (engineer)” as british engineer. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the people & ideas register because the source frames it as british engineer. Its deeper value depends on whether names, dates, institutions and citations support that framing.
The entry’s evidential value lies in the named roles, institutions and publications that can be tested against primary documentation. The source revision retrieved here is dated May 11, 2026. The linked authority identifier is Q6847016. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1946, 1969, 2006 and 2007.
Public reputation and documentary evidence do not always develop together; absence from a summary is not evidence of historical absence. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Read biographical claims against dates, named institutions and the cited references. Distinguish a subject’s later reputation from evidence produced during their lifetime.
- Establishing names and roles
- Building a first chronology
- Locating cited institutions
Personal papers, civil or court records, institutional files and the scholarship cited by the source.
Three-step research path
- Establish the record: confirm the title “Mike Glover (engineer)”, its source revision and the description used here.
- Expand the search: follow Mike Glover (engineer) primary sources, Mike Glover (engineer) archive and Mike research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Mike Glover (engineer)”?
- Which claims depend on a single source or contested interpretation?
- Which primary records establish identity, chronology and institutional ties?
Search terms from this dossier
This entry incorporates text from “Mike Glover (engineer)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.