The Mettlen–Lavorgo powerline, also called the Lukmanier powerline, is the 400 kV three-phase alternating current high voltage electric power transmission line over the Lukmanier Pass in Switzerland, from Mettlen substation (47°6′55″N 8°20′15″E), next Inwil, about 7-kilometre (4.3 mi) south of Hochdorf, to Lavorgo substation (46°26′28″N 8°50′20″E), next Lavorgo, about 5-kilometre (3.1 mi) south of Faido. Trees falling on the line in 2003 caused a major blackout in Italy.

History

The powerline was built in 1948–1949. In 2006, 17 transmission towers between Sisikon and Ingenbohl and in 2008, 28 transmission towers between Arth and Küssnacht am Rigi were replaced.

On 28 September 2003, during a storm, two trees hit the powerline in Brunnen, causing a major blackout in Italy.

The loss of power affected most of all peninsula; nearly 50 million people remained cut-off for up to 18 hours.

Description

On the 52-kilometre (32 mi) long section from Mettlen to Amsteg it shares the pylons with the Gotthard Powerline. After Amsteg the Lukmanier Powerline runs on its own track.

On the section between Mettlen and Amsteg 160 pylons are used with two level and three level arrangements of the conductors. For the 53-kilometre (33 mi) long section between Amsteg and Lavorgo over the Lukmanier Pass 145 pylons for one circuit with one level arrangement of the three conductors are used.

Editorial summary

The public source identifies “Mettlen–Lavorgo powerline” as 380 kV overhead power line in Switzerland. This brief keeps that definition visible, then builds a research path around Mettlen, Lavorgo and powerline.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—2003, 1948, 1949, 2006—that can be checked directly. The linked authority record independently contributes the date 1940. Its value is orientation rather than verdict, with Mettlen, Lavorgo and powerline providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Mettlen–Lavorgo powerline”, the useful work is to connect “380 kV overhead power line in Switzerland” to the records capable of establishing context and consequence.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q678976. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2003, 1948, 1949 and 2006.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Mettlen–Lavorgo powerline”, its source revision and the description used here.
  2. Expand the search: follow Mettlen–Lavorgo powerline primary sources, Mettlen–Lavorgo powerline archive and Mettlen research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Mettlen–Lavorgo powerline”?
  2. Which institution is responsible for the underlying evidence?
  3. What terminology or title could unlock a more precise catalogue search?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Mettlen–Lavorgo powerline” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.