Mexico City Metrobús Line 5
bus rapid transit line

The Mexico City Metrobús Line 5 is a bus rapid transit line in the Mexico City Metrobus. It operates between Río de los Remedios in the boroughs of Gustavo A. Madero, in Mexico City's northern limit with the municipality of Ecatepec de Morelos in the State of Mexico, to Preparatoria 1 in Xochimilco.
Line 5 has a total of 51 stations and a length of 28.5 kilometers, which runs from northeastern to eastern Mexico City.
History and construction
Construction of Line 5 started on March 26, 2013 and it was inaugurated on November 5, 2013 by Miguel Ángel Mancera, then-Head of Government of the Federal District. The service ran from Río de los Remedios to San Lázaro.
Expansion works for Line 5 started in August 2017. It was planned to extend the line until Preparatoria 1, although originally intended to be extended to Glorieta de Vaqueritos in the limits of Tlalpan and Xochimilco boroughs), in southeastern Mexico City. The first extension added 26 stations along 16 kilometers. The second extension added 4 kilometers and 7 stations to the line, serving the Coyoacán, Tlalpan, and Xochimilco boroughs.
Service description
Services
The line has three itineraries.
“Mexico City Metrobús Line 5” enters the record as bus rapid transit line. Crown Archives preserves that source wording while asking what Mexico, City and Metrobús can confirm, complicate or overturn.
Why this record matters
“Mexico City Metrobús Line 5” is worth following because a concise public description often conceals a longer documentary argument. Here, Mexico, City and Metrobús provides the most credible route into that argument.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 16, 2026. The linked authority identifier is Q56064475. None of the 2 selected statements returned an explicit reference. The first chronological checks are 2013 and 2017.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Mexico City Metrobús Line 5”, its source revision and the description used here.
- Expand the search: follow Mexico City Metrobús Line 5 primary sources, Mexico City Metrobús Line 5 archive and Mexico research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Mexico City Metrobús Line 5”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Mexico City Metrobús Line 5” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.