Meråker Line
railway line in Trøndelag, Norway

The Meråker Line (Norwegian: Meråkerbanen [ˈmeːroːkərˌbɑːnən]) is a 72-kilometer (45 mi) railway line which runs through the district and valley of Stjørdalen in Trøndelag county, Norway. The line branches off from the Nordland Line at Hell Station and runs eastwards to the Norway–Sweden border, with Storlien Station acting as the border station. From there, the line continues as the Central Line. Traditionally, the Meråker Line was regarded as the whole line from Trondheim Central Station to the border, a distance of 102 kilometers (63 mi). There are two daily passenger train services operated by SJ Norge and a limited number of freight trains hauling lumber and wood chippings.
The line underwent electrification in the early 2020's, which was completed in 2025.
Route
The Meråker Line is defined as the section between Hell and the Norway–Sweden border at Storlien. Until 2008, it was regarded as the entire section from Trondheim Central Station to Storlien. The line was initially 102.23 kilometers (63.52 mi) to the border, or 105.97 kilometers (65.85 mi) to Storlien Station. With the new definition, the line is 70.69 kilometers (43.92 mi).
“Meråker Line” enters the record as railway line in Trøndelag, Norway. Crown Archives preserves that source wording while asking what Meråker, Line and railway can confirm, complicate or overturn.
Why this record matters
“Meråker Line” is worth following because a concise public description often conceals a longer documentary argument. Here, Meråker, Line and railway provides the most credible route into that argument.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Jul 11, 2026. The linked authority identifier is Q512662. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2020, 2025 and 2008.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Meråker Line”, its source revision and the description used here.
- Expand the search: follow Meråker Line primary sources, Meråker Line archive and Meråker research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Meråker Line”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Meråker Line” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.