Amherst Islander II
ship built in 2020

The Amherst Islander II is a hybrid electric-diesel ferry boat which serves to connect Amherst Island to the mainland across Lake Ontario. It has terminals at Millhaven Wharf in Millhaven, Ontario and Stella Wharf on Amherst Island. It replaces the Frontenac II built in 1962. The Amherst Islander II was constructed with another ferry, the Wolfe Islander IV, using the same hybrid technology for a purchase price of roughly $94 million.
The Amherst Islander II was launched November 2019, from Damen Galați shipyard in Romania. The new ferry has an LOA of 72 metres, a beam of 20 metres, a gross tonnage of 1,230, and capacity for 300 passengers and 42 cars. The vessel is designed to be capable of fully electric operation but is also equipped with twin diesel generators to allow hybrid or full diesel propulsion for maximum redundancy or for sailings at a top speed of 12 knots.
Service history
Despite being launched in November 2019 and arriving in Canadian waters in 2021, the Amherst Islander II faced significant delays before entering service. Originally anticipated to begin operations in early 2020, the ferry remained inactive for over two years due to staffing shortages, infrastructure setbacks, and operational complications.
In 2023, the vessel was temporarily repurposed to support training for its sister ship, Wolfe Islander IV, after a docking incident damaged the Wolfe Islander’s ramp.
This brief starts where responsible research should: with the source description of “Amherst Islander II” as ship built in 2020. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as ship built in 2020. Its deeper value depends on whether names, dates, institutions and citations support that framing.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 20, 2026. The linked authority identifier is Q104380928. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1962, 2019, 2021 and 2020.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Amherst Islander II”, its source revision and the description used here.
- Expand the search: follow Amherst Islander II primary sources, Amherst Islander II archive and Amherst research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Amherst Islander II”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Amherst Islander II” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.