Luas
tram system in Dublin, Ireland

Luas (, Irish: [ˈl̪ˠuəsˠ]; meaning 'speed') is a tram system in Dublin, Ireland. There are two main lines: the Green Line, which began operating on 30 June 2004, and the Red Line which opened on 26 September 2004. Since then, the red line has been extended and split into different branches further out of the city and the green line has been extended north and south as a single line. Since the northern extension of the green line in 2017, the two lines intersect in the city centre. The system now has 67 stops and 42.5 kilometres (26 mi 719 yd) of revenue track, which in 2024 carried 54 million passengers, an increase of 12% compared to 2023. The two lines carried 55 million passengers in 2025.
Luas is operated by the KeolisAmey consortium, having been operated from commencement to August 2026 by Transdev, under tender from Transport Infrastructure Ireland (TII) (prior to the RPA merger with the National Roads Authority to form TII, the tender was originally under the defunct Railway Procurement Agency. The Luas was a major part of the National Transport Authority's strategy (2000–2016). Four extensions to the initial Luas lines have been completed. Construction of a six-kilometre (3+1⁄2-mile) extension of the Green line through the north city centre to Broombridge, which linked both Green and Red lines, began in June 2013 and opened to passengers in December 2017.
The public source identifies “Luas” as tram system in Dublin, Ireland. This brief keeps that definition visible, then builds a research path around Luas, tram and system.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Luas”, the useful work is to connect “tram system in Dublin, Ireland” to the records capable of establishing context and consequence.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 17, 2026. The linked authority identifier is Q612560. 1 of 1 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 2004, 2017, 2024 and 2023.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Luas”, its source revision and the description used here.
- Expand the search: follow Luas primary sources, Luas archive and Luas research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Luas”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Luas” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.