CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Los Santos Wind Farm

onshore wind farm in Costa Rica

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionNov 3, 2024
Entity authorityQ96390826 ↗
Source-derived summary

Los Santos Wind Farm, (Spanish: Parque Eólico Los Santos) is a wind energy project located in Los Santos region of Costa Rica, alongside the Inter-American Highway (Route 2). It is operated by the local public utilities cooperative, Coopesantos, and generates 30% of their distributed energy.

Editorial summary

The public source identifies “Los Santos Wind Farm” as onshore wind farm in Costa Rica. This brief keeps that definition visible, then builds a research path around Santos, Wind and Farm.

Editorial reviewA concise reference frame for defining the subject, testing terminology and identifying the institution closest to the evidence. The current 45-word lead offers orientation but no explicit four-digit date, so chronology should not be assumed. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with Santos, Wind and Farm providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Los Santos Wind Farm”, the useful work is to connect “onshore wind farm in Costa Rica” to the records capable of establishing context and consequence.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Nov 3, 2024. The linked authority identifier is Q96390826. Authority coordinates are 9.777, -83.996. None of the 1 selected statements returned an explicit reference.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Los Santos Wind Farm”, its source revision and the description used here.
  2. Expand the search: follow Los Santos Wind Farm primary sources, Los Santos Wind Farm archive and Santos research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Los Santos Wind Farm”?
  2. Which institution is responsible for the underlying evidence?
  3. What terminology or title could unlock a more precise catalogue search?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Los Santos Wind Farm” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.