Dagenham wind turbines
wind turbines in East London, England

The Dagenham wind turbines are three 85-metre (279 ft) high Enercon E-66 and one E-82 wind turbines located on the Dagenham estate of the Ford Motor Company in East London, England. The first two turbines were completed in April 2004 and the third was installed in 2011. They are landmarks of the skyline and the first wind farm to be built in London.
Planning and building
One turbine is located in the London Borough of Barking and Dagenham (Turbine 1), the second in the Hornchurch Marshes area of the London Borough of Havering (Turbine 2). Planning consent was received from both boroughs. The Mayor of London gave approval for the project in August 2003.
The turbines were constructed by the green energy company Ecotricity. Planning consent was also given for a third 65-metre (213 ft) high turbine (Turbine 3) in Havering, with a viewing platform which was not constructed. The planned operating date for the third wind turbine was by the first quarter of 2009, and it was eventually installed in 2011.
Specifications
The turbines are located 10 miles (16 km) east of the City of London at OS grid reference TQ492824 and TQ502818.
The public source identifies “Dagenham wind turbines” as wind turbines in East London, England. This brief keeps that definition visible, then builds a research path around Dagenham, wind and turbines.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Dagenham wind turbines”, the useful work is to connect “wind turbines in East London, England” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 26, 2025. The linked authority identifier is Q5208492. Authority coordinates are 51.522, 0.151. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2004, 2011, 2003 and 2009.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Dagenham wind turbines”, its source revision and the description used here.
- Expand the search: follow Dagenham wind turbines primary sources, Dagenham wind turbines archive and Dagenham research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Dagenham wind turbines”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Dagenham wind turbines” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.