Line 6 (Xuzhou Metro)
Constructing metro line in Xuzhou

Line 6 of the Xuzhou Metro (Chinese: 徐州地铁6号线) is a rapid transit line in Xuzhou, Jiangsu, China. The first phase opened on 28 September 2025 with 16 stations, spanning 22.9 km long. Line 6 is the first fully automated metro line using GoA4 automation level in Xuzhou.
History
On 28 November 2020, the groundbreaking ceremony of the second phase of Line 3 and the first phase of Line 6 were held at Municipal Administrative Center station.
On 27 May 2025, Line 6 passed the acceptance of the civil engineering of the depot for entry and exit lines in the first phase of the project.
On 5 June 2025, Line 6 started trial operation in 3 months with no passengers and passed the acceptance on 10 September 2025.
On 20 September 2025, Line 6 opened a three-day trial ride activity for the public.
On 28 September 2025, the first phase of Line 6 officially put into operation.
Stations
All 16 stations are underground.
The line operates from 6:00 to 22:30.
Begin with the source’s own compact description: “Line 6 (Xuzhou Metro)” is constructing metro line in Xuzhou. The dossier treats that line as a proposition to test through Line, Xuzhou and Metro, not as a finished interpretation.
Why this record matters
The phrase “constructing metro line in Xuzhou” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jun 3, 2026. The linked authority identifier is Q104541241. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2025 and 2020.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Line 6 (Xuzhou Metro)”, its source revision and the description used here.
- Expand the search: follow Line 6 (Xuzhou Metro) primary sources, Line 6 (Xuzhou Metro) archive and Line research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Line 6 (Xuzhou Metro)”?
- What terminology or title could unlock a more precise catalogue search?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Line 6 (Xuzhou Metro)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.